Chapter 10: Reality Sets In—Labor Struggles

Theme Song: “Factory,” Bruce Springsteen

My toothpaste tasted like chalk. Even worse, I had to scrape it off my teeth. This went on for three days until I used a Spanish-to-English translator to decipher the words on the side of the tube—denture glue!? When it rains it pours, the saying goes, and this was only a drizzle of what was to come.

It is tempting to idealize our project and tell you how glamorous it is to build a luxury resort on a private island in the crystal-clear waters of the Caribbean. Sounds like a fairy tale, right? The truth is, at times we’re on the wrong end of that fairy tale, like the big bad wolf is breathing down our necks!

It’s no wonder, I suppose. We are building in a foreign land where the language and culture are a mystery to us. The resort will be 100 percent off the grid, which requires our own water, power, and wastewater treatment systems.

Our island is a mangrove swamp, which means our buildings need to be positioned on pilings. We need literally tons of fill dirt and copious channels to reroute water.

And if that isn’t enough, most of our structures are being constructed over the water, nearly doubling our building costs.

The First Containers Arrive from Bali

We were elated at the arrival of the first two containers from Bali! They contained the restaurant and three villas. The overwater foundations were not complete, but we had prepared a temporary bodega on the island to store them.

The team in Bali had painstakingly wrapped, color-coded, and labeled each individual piece. They also provided a manual with specific handling instructions. For example, “When transporting the materials during bad weather, always cover with a tarp. If the cartons become wet, it can stick to the wood.” And, “When unloading the container and transporting the panels, never lay them down flat, always keep them up straight. Additionally, when storing them, make sure they are 100 percent straight up against a wall or poles.”

Then we received the following picture of the containers being unloaded. The exquisite teak wood with over four thousand hours of hand carving was laying on the dock in the rain! The workers were doing everything wrong, but of course the buck stops with me. I failed to anticipate this situation.

The first container from Bali being unloaded in Panama

Fixing It

I was in Michigan at the time and couldn’t sleep for two nights. The message from our team in Bali said simply, “Our hearts are broken.”

The unloading of the first container on the mainland and transportation to our island by barge took sixteen hours! The rain drizzled all day making work miserable. But the real trouble came about 3:00AM, within a half hour of finishing up, when the rain came down in sheets, soaking everything.

Much of the restaurant would require refinishing and some of the damaged items would need to be replaced. Worst of all, during the mayhem no one was taking care to ensure the contents were kept organized. Later it would take three men two weeks to reorganize the contents of the bodega so they could find things when assembling the villas and the restaurant.

Needless to say, we have since found ways to ensure that our precious cargo from Bali is handled correctly.

Labor Unrest

I received the following WhatsApp text from a friend in Bocas Town on a Thursday night at 11:46PM: “TODAY – the syndicate spoke about your project at the town hall. They are saying that your project is not paying the employee fees properly. The syndicate has requested an inspection from the labor and social security departments. Watch out!”

This was our worst nightmare and we were taken completely by surprise. I have watched many projects stop mid-construction in Central America and left to rot. We couldn’t afford to be one of them.

Another building stopped mid-construction in Central America

A high-integrity Panamanian contractor named Virgilio is leading our project. Virgilio employs eight men of his own but relies primarily on subcontractors due to the size of the project. It is not unusual to have fifty or more workers on the island at any given time; the peak was over seventy. We thought it was the subcontractor’s responsibility to abide by the Panama labor laws. As it turns out, there were issues that needed to be corrected immediately.

After a week of anguish, Virgilio, Daniel (our project attorney), Virgilo’s labor attorney, and the Minister of Labor met with all the workers on the island for collective bargaining. After hours of negotiation, every worker signed an agreement that brought us back into compliance. We all breathed a sigh of relief!

Picnic tables on the island, one improvement resulting from the labor negotiations

It is easy to get frustrated and point fingers when it comes to things like the mishandling of Balinese furnishings, labor issues, and general miscommunication. However, the root cause can usually be traced to language barriers and cultural differences. Patience, over-communication, and forgiveness is generally the best formula for success.

The scale of this resort requires an enormous amount of physical labor. For example, it takes four men a full day to install two cement pilings. When the project is finished Bocas del Toro will have over one thousand pilings, which is 16,000 man-hours! How can we be anything but overwhelmed with gratitude for our Panamanian friends and workers as they help us to make our dream come true, one cement a piling at a time.

Have you ever worked with someone from a different culture? What differences did you experience compared to what you expected? How did you resolve the differences?


Share this post

Signup: Blog Updates


Recent Posts:

8 responses to “Chapter 10: Reality Sets In—Labor Struggles”

  1. Dave Vander Meiden says:

    I worked for a large German telecommunications company for most of my career. The traditional German product development process required a detailed plan be written during the definition phase of the project, and then the approved plan was executed from beginning to end with minimal changes during the realization phase of the project. If an unanticipated condition occurred during the realization phase (for example, the customer requirements changed or a new and better technology or idea came along), you ignore the new condition and continue to execute the original approved plan until completion. Imagine working this way for the construction of Bocas del Toro!

    Toward the end of my career, German culture slowly evolved as they came to realize their old methodology did not lend itself toward entrepreneur-like innovation in a world of fast-paced advances in technology. The company eventually adopted a new “Agile Process” for developing new products, and it works so much better!

  2. Anonymous says:

    Dave,

    Thanks for sharing your story. if we had to follow the traditional German methodology we would have been doomed from the start. Our approach has been consummate entrepreneurship which has its problems too – it feels a little like the wild west. We seem to make about 15 pivots a day which is enough to make your head swing. Our innovation is on the fly with people chiming in from around the world every day. Sometimes I feel like we need more process as it gets quite chaotic and can be stressful at times. But for some reason it seems to be working judging by the end product of the resort that is starting to emerge from the foundations that were built early in the year. It is an exciting time during the building of Bocas del Toro.

    Thank you for your contribution. It really made me think. Cultures around the world are so different and we all tend to think that our way is the best, but the reality is that we can all learn from each other.

    Dan

  3. Hi Dan,
    We remember you and your Family as wonderful guests at our Lodge in South Africa.
    We love your blog and have our word for these things happening: TIA.
    Short for “this is Africa”…………what can go wrong goes wrong, and you only survive with a smile on your face, a lot of patience and a good sense of humor. AND MORE PLANNING 😉

    We are sure your project will turn out wonderful.
    Good luck…. we hope to have the chance to visit Bocas del Toro in the future.

    Sabine, Masodini Game Lodge

  4. Dan Behm says:

    Hi Sabine,

    It is so good to here from you! And I am honored that you read my blog. Our family has traveled to many resorts over many years, but they all say that our stay at Masodini Game Lodge was by far the best. I especially remember the deliciois family style dinners in the magical outdoor setting you have created for dining. If we ever return to Africa, Masodini will definitely be one of our stops.

    I chuckled when you mentioned TIA. I am learning a lot of patience in Panama and most of the time with a smile. But every now and then I get frustrated . The next time I do, I will think of TIP. It will bring levity to the situation and help me not to take things to seriously. As they say in Costa Rica – Pura Vida.

    Thanks again for commenting Sabine. I love hearing from old friends and it is just fun to get insights from others in general. My fellow Bocas del Toro blog adventurers have been a significant encouragement to me on this project.

    Best Wishes,

    Dan

  5. Dan Behm says:

    I received an email from my good friend Frank Feraco regarding this post that I thought was appropriate.

    “Never give up – never ever give up,……..Vince Lombardi.”

  6. Anonymous says:

    I received an email from my good friend Frank Feraco regarding this post that I thought was appropriate.

    “Never give up – never ever give up,……..Vince Lombardi.”

    Dan

  7. I am building Puntamalibu.com in panama, and I have to say I am impressed with your project.
    if you are ever down in Coronado, please stop by.

    Regards
    Moti

  8. Marcela says:

    Nice post. I learn something totally nnew and challenging
    on sites I stumbleupon on a daily basis. It’s always
    edciting to read through articles from other authors and practice a littl
    something from other websites.

Leave a Reply

Your email address will not be published. Required fields are marked *